- Fiddlers Ferry, Warrington
Felindre WTW, South Wales
| Location |
|
|---|---|
| Sector | Water |
| Products |
Felindre Water Treatment Works in South Wales is one of the largest plants in the country, producing water for up to 600,000 customers in Swansea, Carmarthenshire, Bridgend and West Cardiff.
During groundworks excavations on site, a range of our structural and environmental monitoring equipment were used to ensure the structural safety of existing infrastructure & buildings.
Due to the need to monitor the critical infrastructure for structural movement throughout the works, we supplied our automated total station. Once installed on site, live data was transmitted to our Insite web portal, where the customer could easily monitor the structural stability of the building and be alerted should any movement be detected.
We also supplied our Portable Vibration Monitor, which could be easily moved around site for use when required. A lightweight unit, housed in an IP67 rated case, it features both audible and visual alert beacons to warn of any vibration level breaches.
Learn more about structural monitoring
For all project specific design and technical enquiries, please contact your local service team
If you want to talk to us about your project, send us an email and a brief outline of how we can help and we’ll be in touch
[email protected]
“The vibration monitoring equipment was required due to the works being undertaken near critical infrastructure at the water treatment works. Mabey Hire’s monitoring solutions gave us the confidence and assurance that our works were not affecting the existing structures on site, enabling us to continue safely. At Young Bros, we’ve engaged the services of Mabey Hire previously and knew that their service could be relied on.”