The contract to improve and realign a key rail route passed an important landmark at the end of July, with the completion of the main structural steelwork for the new Baker Viaduct in Dewsbury. Facilitating part of the assembly works, we supplied a large amount of our propping towers for installation on site.
The Baker Viaduct is a key component of the TransPennine Route Upgrade (TRU), and one of the largest live civil engineering projects in the UK. The Baker Viaduct contract has been led by BAM Nuttall, with Severfield Nuclear & Infrastructure undertaking the fabrication and erection of the 2,400 tonnes of steelwork, including design of temporary works. As part of this, Severfield called on us to supply and coordinate a series of our Mat 125 steel trusses to serve as temporary supports during the viaduct’s on-site assembly and erection process.
The 350-metre-long viaduct at Ravensthorpe now spans both the River Calder and the Calder & Hebble Navigation Canal following the crossing of the historic man-made waterway last year. The viaduct will connect with a grade-separated flyover supporting a four-track layout of rail lines, offering access to Wakefield and Leeds. Crucially, the improved infrastructure will facilitate faster services to overtake stopping trains, cutting journey times and increasing capacity for both freight and passenger services.
The Projects Associate Director for Severfield Nuclear & Infrastructure, Gareth Day commented: “Installing the final drop-in span is a very proud achievement for the Severfield Bridge team. The final lifts on site mark nearly two years of meticulous planning and engineering to successfully fabricate, deliver and install the 2,400t viaduct.
“Although we do have a lot of kit in-house, including trestles which we have designed and fabricated, the reason we needed Mabey Hire’s help for this job was the significant amount of trestling needed and the fact we had other large projects on at the same time. A large number of the team know Mabey Hire’s Mass and Mat 125 equipment quite well, either as a legacy or technical connection – and we’ve delivered many bridges over the years using Mabey Hire kit.”
As part of our service on the Baker Viaduct project, we coordinated the supply and delivery of our Mat 125 Towers to the site at Ravensthorpe in Dewsbury in line with Severfield’s strictly managed programme times. There were up to eight of the assemblies, in place at the peak of the work with the tallest being 7m in height.
Photo credit: BAM