Bridge strengthening or replacement works are often disruptive to the public through unpopular, lengthy diversions. Our range of temporary vehicle bridges are the ideal solution for planned, reactive and emergency works.
Our vehicle bridges span up to 80m and are suitable for use over motorways to minor rural lanes They help speed up the contractors’ works programme by removing traffic from the area completely.
The availability and speed of construction of our vehicle bridges enable us to provide rapid over-bridge or diversion routes, which is ideal for use in emergency situations. They have been used after a bridge strike, replaced storm damaged bridging or when a structural fault is identified on the road or rail network.
We have two core types of temporary vehicle bridges available for hire:
Ideal for situations needing rapid deployment, this bridge is delivered to site fully assembled and caters for spans up to 20m.
Panel bridges (Mabey Universal and Compact 200)
Supplied in ‘flat pack’ format for construction on site, our modular panel bridges have been developed for longer spans and load capacities.
View or download here
Our range of quickbridges and panel bridges provide solutions for vehicle traffic. Find the right solution for your project.
For all project specific design and technical enquiries, please contact your local service team
If you want to talk to us about your project, simply send us an email and a brief outline of how we can help and we'll be in touch
During the removal of an old bridge and construction of a new structure as part of the Crossrail project, a temporary bridge needed to be installed within a possession of just four hours to minimise disruption.
Find out moreA three mile section of the A591 in the Lake District was left completely impassable after it collapsed following flooding. A new route was identified which crossed rivers at two points, meaning two temporary bridges were required.
Find out morePooley Bridge village was cut in two by extensive flooding, causing considerable disruption to residents and businesses. This led to an urgent need for a temporary bridge during the design stage of a new, permanent structure.
Find out moreDuring the construction of a new wind farm substation near Inverness, a bridge to carry a 197 tonne load was required. We designed and installed the perfect solution.
Find out moreAs part of the Crossrail project, a new bridge was required to accommodate overhead cables to introduce greener electric trains. Our temporary bridging system supported the existing services during construction.
Find out moreA major refurbishment project at Stanlow Oil Refinery was going ahead with the replacement of the 475 tonne cyclone head at the heart of it. Delivery to site required our versatile Quickbridge system.